OUR PROJECTS

Energy Projects

Explore how Global Performance Solutions delivers safe, efficient execution across onshore and offshore construction projects, backed by experienced teams and disciplined project oversight.

Untitled design - 2026-04-22T172630.539.png
gps_coatings_fabric_maintenance_guyana_e

FPSO Construction

FPSO construction package delivered by GPS covering fabrication, installation, and pre-commissioning of process-deck modules.

gps_coatings_fabric_maintenance_guyana_e

FPSO Construction and Facility Upgrade

FPSO construction and facility upgrade campaign, delivering modular topside upgrades that ready the asset for the next phase of production.

gps_coatings_fabric_maintenance_guyana_e

FPSO Construction and Facility Maintenance

FPSO construction and facility maintenance package executed by GPS, integrating structural, mechanical, and instrumentation scopes under one offshore crew.

gps_coatings_fabric_maintenance_guyana_e

FPSO Industrial Coatings

Industrial coatings and surface preparation campaigns delivered by GPS crews on offshore assets, extending asset life in a harsh marine environment.

gps_coatings_fabric_maintenance_guyana_e

FPSO Facility Upgrade, Project Management

FPSO facility upgrade project management offshore, covering schedule control, cost tracking, vendor coordination, and turnover documentation.

gps_coatings_fabric_maintenance_guyana_e

FPSO, Facility Upgrade

Multi-discipline facility upgrade aboard the BW Pioneer FPSO, delivered for BW Offshore on the asset.

gps_coatings_fabric_maintenance_guyana_e

Scaffold, Main Deck AFT End

Engineered scaffolding installed at the aft end of an FPSO main deck, providing safe access for maintenance and inspection crews working at height in tight structural geometry.

gps_coatings_fabric_maintenance_guyana_e

Sonar Pole Scaffold Design, Construction

Bespoke scaffolding designed and erected around an FPSO sonar pole during the construction phase, providing safe 360-degree work zones for fabrication and welding teams.

gps_coatings_fabric_maintenance_guyana_e

Sonar Pole Scaffold, Construction Phase

Night-shift scaffolding erected around the sonar pole installation, designed to keep construction on schedule without compromising offshore safety standards.

gps_coatings_fabric_maintenance_guyana_e

Tower Module 12A Deck, ATEX Access Works

ATEX-compliant scaffolding and access works on Tower Module 12A, executed inside a classified hazardous area to support electrical and instrumentation trades.

gps_coatings_fabric_maintenance_guyana_e

Module 11B Deck, Commissioning Support

Module 11B deck commissioning support, including access provisioning and integrated trades coordination during the pre-handover phase.

gps_coatings_fabric_maintenance_guyana_e

Module 11C Deck Handrail, Beacon Light Install

Handrail fabrication and installation on Module 11C deck to support beacon-light access, completed offshore with full HSE compliance.

gps_coatings_fabric_maintenance_guyana_e

Module 12B Deck, Flange Management Campaign

Flange management campaign on Module 12B deck, including joint integrity, torque records, and leak-test handover documentation.

gps_coatings_fabric_maintenance_guyana_e

Lifting Frame Deployment, Module 3A Deck (Ops Phase)

Lifting frame deployment on Module 3A during live operations, enabling overhead component lifts in a congested process area without halting production.

gps_coatings_fabric_maintenance_guyana_e

Rope Access Cable Pull, Module 10

Rope access technicians executing a cable pull through Module 10 on the process deck, completing the work without the cost or footprint of conventional scaffolding.

gps_coatings_fabric_maintenance_guyana_e

Rope Access Flange Management

Rope access deployment for flange management in restricted-access piping arrays, eliminating the need for full scaffold builds in tight overhead spaces.

gps_coatings_fabric_maintenance_guyana_e

Rope Access Hang Rigging, FPSO Construction

Hang rigging set up via rope access across an overhead structural member during FPSO construction, used to establish rigging points for follow-on trades.

gps_coatings_fabric_maintenance_guyana_e

Rope Access Leak Test Support

Rope access technician supporting a leak test program inside a structural beam intersection, capturing data points that ground-based crews could not safely reach.

gps_coatings_fabric_maintenance_guyana_e

Bolt Torquing via Rope Access, Port Crane Boom Rest (Commissioning)

Rope access torquing of port crane boom rest bolts during commissioning, delivering precision work at height where conventional access was not viable.